Every system our crews delivered on this contract, item by item.

Site & Coordination

02
  • Located in Back Bay, Beacon Hill and City Proper
  • Close coordination to maintain operations at Massachusetts General Hospital, Massachusetts Eye and Ear, Liberty Hotel, and Boston Common

Sewer/Drain system

03
  • 2,500 linear feet of 12" to 24" pipe
  • 4,500 linear feet of 10" to 66" rehabilitation
  • 10 each new manholes/catch basins

Water system

06
  • Temporary water main bypass
  • 10,000 linear feet of 4" to 16" water pipe
  • 1,200 linear feet of 48" water main rehabilitation utilizing HDPE liner
  • 2,000 linear feet of water services
  • 130 each new gate valves
  • 30 each new/reset hydrants

Hot mix asphalt paving

03
  • 10,000 square yards of temporary pavement patching
  • 1,000 square yards of permanent pavement patching
  • 1,000 square yards of cement concrete sidewalk replacement