Roadway Paving
Built for
Full Depth
Road reconstruction ties subbase, binder, and surface courses to what is underneath. We pave after utility work so the street opens once, correctly.
Pulverize and rebuild pavement section with new aggregate base and asphalt lifts.
Hot mix asphalt placement in binder and wearing courses per mix design.
Proof-rolled subgrade and crushed stone base to required density.
MOT plans, certified flaggers, and police coordination for lane closures.
Permanent pavement repair over utility trenches, not temporary cold patch.
Pavement marking and signage subcontractor coordination after final course.
The Field
Protocol
Paving sequences subbase proof, base course, binder, and surface, each layer tested before the next is placed.
Grade check, compaction testing, and base course placement.
Binder course placed, compacted, and density tested.
Wearing course placed within temperature spec with proper joints.
Cool-down, line striping, and traffic control removal.
Where We
Get Called In
Utility-coordinated street reconstruction, parking lots, and municipal overlay programs.
Full street rebuild after water, sewer, and drain replacement.
Commercial lot reconstruction with drainage and striping.
Town-wide overlay programs with crack seal and milling prep.
Full-depth rebuild at high-traffic intersections.
Pavement reconstruction with bike lane striping coordination.
Expedited permanent patch for sinkholes and utility failures.
Delivered for
Public Agencies
Contracted roadway paving work performed for municipal, authority, and state clients across New England.
Operational
Standards
Mix placement follows MassDOT and municipal specs for temperature, compaction, and thickness.
Nuclear density testing on base and binder courses. Surface course placed within temperature spec with proper joint construction.
Traffic control plans are developed in-house and coordinated with local police for lane closures and detours.
Explore More
Other Services
Ready to
Open Lane?
Send pavement sections and traffic control requirements. We will scope reconstruction or overlay.