Watertown & Newton

MWRA Contract 6956, Watertown & Newton

Massachusetts Water Resources Authority

Client: Massachusetts Water Resources Authority

Project Details

Every system our crews delivered on this contract, item by item.

Pipe Rehabilitation

01
  • Cleaning and Cement Mortar Lining

Water System

04
  • 3,200 LF of 20-inch cast iron watermain
  • Installing 10,600 LF of 20-inch DI watermain
  • Replacement watermain and gate valves for the City of Watertown
  • Installing temporary water bypass for Russell Ave and Bellevue Road for installation of new service connections

Sewer System

03
  • Replacement of drain lines, drain manhole and catch basin structures
  • Replacement of sanitary sewer lines and manhole structures
  • Installing valves, precast valve vaults, air valves, blow-off assemblies, manholes

Site & Coordination

04
  • Demolishing and relocating existing Meter 2 from Common/Belmont intersection to Bellevue/Common intersection
  • Replacement of existing Meter 40 on Mount Auburn Street
  • Installation of new pressure reducing valve on Irving Street
  • Installation of temporary stone dust multiuse access paths within DCR area within the Charles River Reservation

Rock Excavation

01
  • Removal, handling, transportation and disposal of rock, contaminated soil, and groundwater