Skip to content
100+
Blast Events Managed
Urban and suburban
0
Vibration Limit Exceedances
Per project target
3
Weeks Average Ledge Advance
Vs. hammer only
OSHA Compliant
Fully Insured
Licensed & Bonded
Vibration Monitored

Built for
Ledge Rock

Rock blasting advances excavation through ledge when hammering is not economical. We manage permitting, vibration monitoring, and site safety on every shot.

Blast Design

Drill pattern and charge design coordinated with licensed blaster.

Vibration Monitoring

Seismograph monitoring at adjacent structures on every shot.

Permit Management

Local and state blasting permit applications and compliance.

Pre-Blast Survey

Condition documentation of adjacent buildings before first shot.

Muck Removal

Post-blast excavation and rock disposal after shot execution.

Urban Blasting

Controlled shots in dense environments with strict vibration limits.

The Field
Protocol

Blasting sequences survey, drill pattern, charge design, shot execution, and muck removal. Neighbor notification happens before every event.

Step 01
Survey & Permit

Pre-blast survey, permit approval, and neighbor notification.

Step 02
Drill Pattern

Hole drilling to design depth, spacing, and burden.

Step 03
Shot & Monitor

Controlled detonation with seismograph monitoring.

Step 04
Excavate & Repeat

Muck removal, grade check, and next bench drill pattern.

Where We
Get Called In

Foundation ledge, utility corridor rock, and site development mass rock removal.

Foundation Ledge

Rock removal for building foundation and basement excavation.

Utility Corridor Rock

Blasting for deep utility trench through ledge rock.

Site Development

Mass rock removal for grading and pad construction.

Road Cut

Rock excavation for roadway alignment through ledge.

Culvert Rock

Blasting for culvert installation through rock outcrop.

Emergency Rock

Unanticipated ledge encountered during active excavation.

Operational
Standards

Licensed blasting contractor coordination with pre-blast surveys and vibration monitoring.

Blaster
Licensed subcontractor coordination
Monitoring
Seismograph on every shot
Permits
Local and state blasting permits
Notification
Pre-blast neighbor notice
Vibration Limits
Per project spec and locality
Service Area
MA, NH

Pre-blast condition surveys document adjacent structures. Vibration and air overpressure monitored on every shot.

Blast design accounts for rock type, burden, spacing, and proximity to occupied buildings and utilities.

Explore More

Other Services

ROCK
Public Sector & Bid Inquiries

Ready to
Shoot Rock?

Send geotechnical data and excavation depth. We will assess blasting feasibility and scope.